Step-by-Step Template Demonstration for Civil QC/QA Quality Planning

Purpose of Task

The purpose of this task is to provide learners with a practical demonstration of completing key quality documents, such as risk assessments, inspection reports, and checklists, in a structured, compliant, and systematic manner. By following this task, learners will:

  • Learn how to prepare, complete, and maintain quality documentation in civil engineering projects.
  • Understand the required structure, content, and approval workflow for key quality documents.
  • Apply UK legislation, building regulations, and standards to real-life documentation.
  • Develop practical skills that ensure accountability, compliance, and effective risk management in construction projects.

Scenario / Context

You are a QA/QC Officer assigned to a mid-rise residential development in London, UK. Your responsibilities include:

  • Preparing and maintaining the project quality plan
  • Completing and reviewing risk assessments, inspection reports, checklists, and non-conformance reports
  • Ensuring compliance with UK standards, legislation, and Building Regulations

Your task is to demonstrate the completion of key documents by following a structured template, ensuring clarity, compliance, and traceability.

Relevant UK Legislation and Standards:

  • BS EN ISO 9001:2015 – Quality management systems
  • Construction (Design and Management) Regulations 2015 (CDM 2015)
  • Health and Safety at Work Act 1974 (HSWA 1974)
  • Building Regulations 2010 – Structural, safety, and finishing standards
  • BS EN 206 – Concrete specification, production, and conformity

Step-by-Step Template Demonstration

1. Risk Assessment Template Completion

Purpose: Identify hazards, evaluate risk, and implement controls to mitigate potential incidents.

Template Fields:

  • Project/Location: Mid-rise residential building, London
  • Task/Activity: Concrete pouring for structural slab
  • Hazard Identification: Falling objects, concrete burns, improper curing
  • Risk Evaluation: Likelihood x Severity = Risk rating (High/Medium/Low)
  • Control Measures: PPE, barriers, supervision, proper curing protocols
  • Responsible Person: Site Supervisor / QA Officer
  • Review Date: Scheduled weekly or after major works

Example Entry:

TaskHazardRisk
Level
Control MeasuresResponsibleReview
Date
Concrete
pouring
Concrete
burns
MediumPPE gloves, eye
protection, barrier
tape
QA Officer15/12/2025
Concrete
pouring
Improper
curing
HighUse curing
compound, monitor
temperature, daily
checks
Site
Supervisor
15/12/2025

Assessor Notes: Ensure risk ratings are realistic and mitigation measures comply with HSWA 1974 and BS EN 206.

2. Inspection Report Template Completion

Purpose: Record inspection results, identify non-conformances, and provide evidence of compliance.

Template Fields:

  • Project: Mid-rise residential building, London
  • Inspection Date: 14/12/2025
  • Inspector Name & Role: QA Officer – John Smith
  • Inspection Type: Concrete reinforcement placement
  • Observed Conditions: All steel spacing within tolerance, formwork aligned
  • Non-Conformance: None observed / or describe issue
  • Corrective Action Required: If any, specify action
  • Approval Signature: Inspector & Project Manager

Example Entry:

Inspection
Date
TaskObserved
Condition
NonConformanceCorrective
Action
InspectorApproval
14/12/2025Steel
reinforcement
Correct
spacing,
aligned
NoneN/AJohn
Smith
PM
Approval

Assessor Notes: Ensure inspection reports reference relevant BS EN standards and Building Regulations 2010.

3. Checklist Template Completion

Purpose: Ensure routine verification of activities, processes, and material compliance.

Template Fields:

  • Project/Location: Mid-rise residential building, London
  • Activity: Formwork installation
  • Checklist Items: Alignment, anchorage, strength, markings Yes/No or Compliant/Non-Compliant
  • Comments: Observations, issues, or corrective actions
  • Responsible Person: QA Officer/Site Supervisor
  • Date: Daily/Weekly

Example Entry:

ItemCompliant
(Yes/No)
CommentsResponsibleDate
Formwork
alignment
YesChecked for level
and plumb
QA Officer14/12/2025
AnchorageYesAll anchors secureSite
Supervisor
14/12/2025

Assessor Notes: Ensure checklists cover critical control points and are signed off by responsible personnel.

4. Non-Conformance Report (NCR) Template Completion

Purpose: Document deviations from project specifications and implement corrective actions.

Template Fields:

  • Project: Mid-rise residential building, London
  • NCR Number: NCR-001
  • Date Issued: 14/12/2025
  • Task/Activity: Concrete slab finishing
  • Non-Conformance Description: Surface uneven, minor honeycombing
  • Immediate Action: Mark and cordon area, inform contractor
  • Corrective Action: Re-surface and re-compact concrete
  • Responsible Person: QA Officer/Site Supervisor
  • Closure Date & Approval: After corrective action verification

Example Entry:

NCR
No
TaskDescriptionImmediate
Action
Corrective
Action
ResponsibleClosure
Date
Approval
NCR001Concrete
finishing
Minor
honeycombin
Cordon
area
Re-surface
& compact
QA Officer16/12/2025PM
Approval

Learner Task

Learners are required to:

  • Review the provided templates for risk assessment, inspection report, checklist, and non-conformance report.
  • Complete each template with realistic data for a civil engineering project scenario.
  • Ensure that all entries comply with UK legislation and standards (ISO 9001:2015, BS EN 206, CDM 2015, HSWA 1974, Building Regulations 2010).
  • Include a brief reflective note on how completing these documents contributes
  • to:
    • Project quality assurance
    • Risk mitigation
    • Stakeholder accountability
    • Compliance with UK regulations

Expected Learner Outcomes

Upon completing this task, learners will be able to

  • Prepare and complete key quality documents using systematic templates.
  • Apply UK-specific legislation and standards in documentation.
  • Demonstrate accountability and traceability in quality assurance processes.
  • Recognize the role of documentation in risk mitigation, project success, and compliance.
  • Develop reflective skills to improve future documentation practices.